1 List of Figures 2 1 Ultra-High-Voltage World Electric Grid1.1 1.2 Bali—gateway1.3 Two-way versus three-way weave.1.4 Strip X cannot be spread above A points nor lowered below B points—ergo, three-way weaves are unspreadable, therefore provide stable pattern and stable structure.1.5 Dymaxion Map with 100 Population Dots1.6 Dhow—ship with a continuous 10,000-year history of Indian Ocean crossings.2.1 Using Ship Mast for Navigational Trigonometry.2.2 Eratosthenes’ map, 200 B.C. Document 3